Q-Logic 64 Manual de usuario Pagina 78

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 244
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 77
4 – Installation
Powering Down a Switch
4-20 59043-03 A
D
10. Display the list of firmware image files on the switch to confirm that the file
was loaded. Refer to the ”Image Command” on page B-23 for more
information.
SANbox2 (admin) $>image list
11. Unpack the firmware image file to install the new firmware in flash memory.
SANbox2 (admin) $>image unpack filename
12. If the new firmware is later than version 2.0, the new firmware can be
activated without disrupting traffic. Enter the Hotreset command to perform a
non-disruptive activation.
SANbox2(admin) $>hotreset
4.4
Powering Down a Switch
Simply unplugging the switch from the power source does not allow the switch to
complete executing tasks and could lead to flash memory corruption. For this
reason, open a Telnet session and use the Shutdown command to initiate an
orderly shut down, then power down the switch. Refer to the ”Shutdown
Command” on page B-88.
Vista de pagina 77
1 2 ... 73 74 75 76 77 78 79 80 81 82 83 ... 243 244

Comentarios a estos manuales

Sin comentarios